M*****f
About Candidate
With over 20 years of combined experience in the textile and utility sectors, I bring a strong background in engineering leadership, plant utilities, and industrial maintenance. I specialize in the maintenance of rotary and stationary equipment, utility infrastructure management, and the installation of large-scale industrial plants, including polyester and glass/float plants. Throughout my career, I have successfully led engineering and utility departments as a Senior Manager, delivering high-impact results in energy optimization, cost reduction, and operational reliability. My expertise lies in managing complex projects, implementing preventive maintenance strategies, and driving engineering excellence in demanding industrial environments—consistently contributing to the growth and efficiency of the organizations I have served.
Salary
Nationality
Looking for Job Title
Location
Work & Experience
As a Senior Maintenance Manager at Tariq Glass Industries Limited, I have successfully led and executed multiple high-impact projects, including the installation of critical manufacturing plants, utility management systems, and cost-saving initiatives. Over my tenure, I have been instrumental in enhancing the operational efficiency and productivity of the company, driving significant improvements in both infrastructure and energy management. Key Responsibilities and Achievements: • Installation and Maintenance Projects: o Spearheaded the installation of Sand Washing Plants, Float Glass Plant, and the complete installation of the Opal Glass Plant. o Led the rebuild of furnaces F-2 and F-3, ensuring their optimal functionality and efficiency. • Utilities Management: o Ensured the glass manufacturing machines received a continuous supply of essential utilities, including compressed air, natural gas, raw/soft water, oxygen gas, diesel, furnace oil, and LPG. • Cost-Saving Initiatives: o In 2022, led the installation of the VPSA oxygen plant, achieving a cost saving of 10 million PKR per month. o Successfully managed the replacement of vacuum pumps, resulting in a power saving of 150 kW per hour, significantly reducing energy costs. • Acquisition and Expansion Projects: o Following the acquisition of the BGL Plant in Hub, Balochistan, I oversaw the installation of a mirror plant and a sand blasting unit. o Led the complete fabrication of pipelines and steel structures with the help of mechanical maintenance team. o Supervised the replacement of all roof shed sheets to improve structural integrity. o Directed the installation of screw air compressors, centrifugal blowers, centrifugal pumps with accessories, and the installation and upgrade of R.O water plants. o Managed the installation of liquid ring vacuum pumps to enhance operational efficiency.


